Equal on Strandać Beach

The 5-week renovation of the sidewalk and parking lot along Strażacka Street in Myszków, in the vicinity of the health clinic, has been completed. The investment contractor, KAFAWOX company, carried out the dismantling of existing street curbs, concrete slab sidewalks, bituminous pavement in the parking lot, and adjusted existing facilities such as drainage wells, sewer grates, and telecommunication manholes.

In place of the old, damaged elements, new elements were installed, including a new concrete block sidewalk, parking lot, concrete curbs, and driveway. The cost of the investment was close to 75,000 Polish zloty.