In the first half of 2009, renovation works on asphalt road surfaces and sidewalks were carried out. So far, a total of 330,000 PLN has been spent on this, renovating 6,500 m2 of asphalt roads and sidewalks managed by the Mayor of Myszkow.
Renovation of rainwater sewers, including inspection chambers.
Expenses: 40,000.00 PLN
34 chambers were adjusted, 8 new manholes were installed.
18 drains were adjusted, 4 complete casings were replaced.
Renewal of horizontal marking.
As every year, horizontal marking was renewed on all municipal roads.
Expenses: 35,000.00 PLN
Approximately 3000 m2 of marking was renewed.
Replacement and supplementation of vertical marking.
Vertical marking on roads, damaged, stolen, or destroyed signs, is constantly being supplemented.
Expenses: 15,000.00 PLN
Ongoing repairs of sidewalks.
In places where damage or destruction occurred, work was carried out to remove these irregularities.
Expenses: approximately 20,000.00 PLN
Approximately 190 m2 of repairs were carried out.
Repair of a neighborhood road connecting Aleja Wolności Street with Leśna Street.
Expenses: 57,000.00 PLN
The repair included the construction of two entrances and partial repair of the remaining concrete surface, along with a section of the sidewalk on Leśna Street.
Repair of roadside ditches (Włodowska Street).
Expenses: 15,000.00 PLN
Approximately 200 meters of ditch maintenance was carried out, with simultaneous profiling of the shoulders.
Cleaning of rainwater sewers.
Cleaning of rainwater sewers on roads managed by the Municipality of Myszkow was carried out.
Cleaning of approximately 400 meters of sewers of various profiles and levels of siltation.
Emergencies
Emergency of rainwater sewer on Sucharskiego Street: 15,000.00 PLN
Culvert on Osińska Góra Street: 3,000.00 PLN