The swimming pool, after almost two years of renovations, will be reopened. The pool basins have already been filled with water, which still needs to be filtered, treated, and heated. After these activities, the facility will be ready for inspection by the sanitary inspectorate. The ventilation and heating systems in the building have been replaced, as well as the internal and external windows and doors, and lighting. The changing rooms, toilets, and showers have new tiles, and the lockers have a new locking and opening system. In the plans is the preparation for the use of a new cash system, a new sauna, and a general cleaning of the facility. The renovation aims to adapt the facility to the current regulations regarding thermal insulation, necessary for the proper use of the building, and most importantly – to reduce energy consumption and limit CO2 emissions. The opening of the swimming pool is dependent on receiving the approval of the facility.